Perform, Achieve & Trade (PAT)

The PAT Scheme is being implemented in three phases

The first phase runs from 2012-2015 covering 478 facilities from eight energy-intensive sectors, namely Aluminum, Cement, Chor-alkali, Fertilizer, Iron and steel, Pulp and Paper, Textiles and thermal power plants.

The second phase runs from 2015-2018 covering 621 facilities from eleven-intensive sectors, namely Aluminum, Cement, Chor-alkali, DISCOMs, Fertilizer, Iron and steel, Pulp and Paper, Railway, Refinery, Textiles and Thermal power plants.

The third phase runs from 2017-2020 covering eleven-intensive sectors, namely Aluminum, Cement, Chor-alkali, DISCOMs, Fertilizer, Iron and steel, Pulp and Paper, Railway, Refinery, Textiles and Thermal power plants.

For the State of Uttar Pradesh, 49 industries have been covered under the PAT Cycle-I, II & II in 11 sectors. In which 02 Industries from Paper & Pulp sector have been considered by BEE as a defaulter under PAT Cycle-I

Designated Consumers in PAT Cycle-I

  • Aluminum : 01
  • Cement: 02
  • Chlor-Alkali: 01
  • Fertilizers: 07
  • Iron & Steel: 01
  • Paper & Pulp: 03
  • Thermal Power Plants: 12

Number of Designated Consumers (DCs) has been increases in PAT Cycle-II as 20 new DCs has been identified for Cycle-II and 02 defaulter DCs has been excluded for Cycle-II. Now, Total number of DCs increases from 25 to 45 industries under PAT Cycle-II in 11 sectors.

Designated Consumers in PAT Cycle-II

  • Aluminum : 01
  • Cement : 03
  • Chlor Alkali: 03
  • DISCOM: 05
  • Fertilizer : 08
  • Iron & Steel : 01
  • Pulp & Paper : 01 ( 02 Defaulter DCs excluded in PAT Cycle-II)
  • Railway : 03
  • Refinery : 01
  • Textile : 01
  • Thermal Power Plant: 18

Number of Designated Consumers (DCs) has been increases in PAT Cycle-III as 02 new DCs has been identified for Cycle-III. Now, Total number of DCs increases from 45 to 47 industries under PAT Cycle-III in 11 sectors.

Designated Consumers in PAT Cycle-III

  • Aluminum : 01
  • Cement : 03
  • Chlor Alkali: 03
  • DISCOM: 05
  • Fertilizer : 08
  • Iron & Steel : 01
  • Pulp & Paper : 02
  • Railway : 03
  • Refinery : 01
  • Textile : 01
  • Thermal Power Plant: 19

PAT Cycle-I has been completed along with EScert allocation process. Now, registration for Trading of EScert has been going on. While under PAT Cycle-II M&V procedure has been carried out by identified DCs.

PAT Cycle-III notification has been issued and new DCs have been identified

  • Designated Consumers List
  • ESCerts Status

© Copyrights 2018, All rights reserved by : UPSavesEnergy.com